News
Borba: new REN boundary takes effect on 19 November
Municipality: Borba

Borba's National Ecological Reserve (REN) boundary was approved by Despacho n.º 14127/2026, published on 18 November. The order takes effect on 19 November 2026, the day after publication.
What has been approved
The order approves the areas and ecological system types shown on the annexed maps, together with the schedule of exclusions. This boundary forms part of the work on revising Borba's Municipal Master Plan (PDM). Publication of the REN boundary does not amount to approval of the PDM revision.
64 areas listed in the exclusions schedule
The annex lists 64 areas. Together, they cover 3,522,247.82 m², about 352.22 hectares: 32 entries with code C total about 266.67 hectares, and 32 with code E total about 85.55 hectares. These figures concern the exclusions listed in the table, rather than the municipality's entire REN area.
In the DGT's technical standard for REN maps, C denotes exclusions for existing commitments, concerning areas with buildings that have been legally licensed or authorised. E denotes exclusions to meet needs for housing, economic activities, facilities and infrastructure.
In Borba's table, the reasons given for C entries include established or committed areas and land already within the urban perimeter. Some entries cover land already provided with infrastructure for future building, or land intended for infrastructure serving green spaces. The code alone does not prove that a plot contains a licensed building.
Entry E25 covers 589,266.16 m², approximately 58.93 hectares, and is justified by the creation of Borba's Business, Logistics, Science and Technology Park. The schedule also refers to the expansion of the Adega Cooperativa winery, tourism developments and agro-industrial activities.
Read the columns "Fim a que se destina" (intended use) and "Síntese da fundamentação" (summary of reasons) together: they describe the purposes and reasons for each exclusion. Exclusion from REN does not, by itself, change the PDM land classification or grant building permission. For a specific project, check the plan in force and all other applicable regimes.
According to the order's reasoning, the opinions of APA/ARH Alentejo and CCDR Alentejo converged on the proposal, enabling definitive approval. The order was signed on 31 August and published on 18 November 2026.
What to check before buying or designing
To assess a property, locate it on the official maps and compare that information with the applicable plans and other constraints. An entry in the exclusions schedule is not, on its own, proof that a plot can be built on.
The order states that the maps and explanatory report can be consulted at the Alentejo Regional Coordination and Development Commission and the Directorate-General for Territory. The boundary map is identified in the National Territorial Information System.


